Planning Mobile Coverage Before Construction Ends
Tenants and residents expect perfect mobile signal everywhere — lifts, basements and car parks included. Retrofitting coverage after a building is finished means opening ceilings and running cables through occupied space. Planning it during construction is far easier and cheaper.
What to plan early
- Space: a telecom equipment room with power, cooling and access.
- Pathways: risers, cable trays and conduits to every floor, basement and lift shaft.
- Power: dedicated circuits with backup.
- Roof space for donor antennas or rooftop sites.
- Fibre entry from more than one direction.
Steps for developers
- Commission an RF design from drawings, before ceilings are closed.
- Choose the approach — DAS or small cells — and the neutral-host partner.
- Install cabling and antennas during fit-out.
- Coordinate operator integration before occupancy.
- Test coverage floor by floor at handover.
Why it adds value
Good indoor coverage is now a selling point for residential and commercial property, and a requirement for many corporate tenants.